Please Read: Standard industry practices recommend ordering 4% to 10% more concrete than is estimated from a volumetric calculation. Some of the situations this will account for are waste, spillage, over-excavation, spreading of forms, loss of entrained air during placement, settlement and a change in volume (hardened concrete volume is 1% to 2% less than that of plastic concrete). Anderson Concrete conducts yield tests to verify design weights and maintains certified scales, therefore is not responsible for shortages that arise from ordering issues.

Flatwork

Enter the width, length, and depth of your pour. This calculator will compute the total cubic yards required.

Please enter a width.
Please enter a length.
Please enter a depth.

*Calculation is an estimate only. Be sure to account for waste, spillage, over-excavation, settlement, spreading of forms, variation in grade or any other changes in volume.


Column

Enter the height, diameter, and number of columns. This calculator will compute the total cubic yards required.

Please enter a height.
Please enter a diameter.
Please enter a number.

*Calculation is an estimate only. Be sure to account for waste, spillage, over-excavation, settlement, spreading of forms, variation in grade or any other changes in volume.